VP12A, Ellesmere Port, Cheshire
Construction of a new cardboard box manufacturing facility.
The project consisted of 10,000m2 of manufacturing space adjacent to an existing cardboard box manufacturing facility, including a link bridge connection between the buildings for the transport of cardboard.
Although unforeseen piling works were encountered and the construction took place during the Covid 19 pandemic and lockdown, completion was achieved within programme.
Services
- Project Management
- Quantity Surveying
- Principal Designer
Value: circa £8m
Programme: 28 weeks